25.2 C
Tacloban City
April 26, 2026 - Sunday | 2:41 AM
Home Blog Page 361

5 dead, including toddler, in Ormoc City highway collision

0

ORMOC CITY – A tragic road accident claimed the lives of five individuals, including a one-year-old child, when a speeding boom truck collided with a motorcycle and a multi-cab along the national highway in Barangay Cabulihan, this city, on Sunday night, June 1, 2025.

The fatal crash occurred around 7:45 pm and killed four people instantly, while one later died in the hospital.

Killed on the spot were a 20-year-old construction worker identified only as “Lloyd”; his one-year-old son, “Kit”; and a couple, “Jumar,” 40, an engineer, and his 41-year-old wife, “Marian,” a housewife. All were residents of Ormoc City. Lloyd’s 19-year-old live-in partner, “Mary,” succumbed to injuries while being treated at a local hospital.

Also injured in the collision were 75-year-old “Cresilda,” a widow and farmer from Barangay Masarayao, Kananga, Leyte, and three children—“JCL,” 11, “Kal,” 8, and “Tal,” 6—residents of Barangay Cabulihan.

Based on the initial investigation by the Ormoc City Traffic Enforcement Unit, Lloyd was driving a RUSI motorcycle with Mary and their child onboard, while Jumar was driving a multi-cab with his wife and three children. Both vehicles were traveling in the same direction toward Barangay Valencia.

Meanwhile, a boom truck, allegedly speeding, was traveling in the opposite direction toward downtown Ormoc. Upon reaching Barangay Cabulihan, the truck suddenly swerved into the opposite lane, colliding head-on with both the motorcycle and the multi-cab. It then hit a parked multi-cab owned by “Antonia,” a resident of the area.

Due to the impact, both Lloyd and his son died instantly, as did the couple inside the multi-cab. Other passengers, including the children and elderly woman, were rushed to nearby hospitals for medical attention.

The driver of the boom truck was uninjured and is now in the custody of the Ormoc City Police Office’s Traffic Enforcement Unit for proper investigation and legal action.
All involved vehicles remained at the scene as of the latest report, pending further examination.

(ROBERT DEJON)

San Juanico repairs start after retrofitting design submission

0
RETRO WORKS. DPWH Sec. Manuel Bonoan disclosed that the repair works at the San Juanico Bridge would commence once the retrofitting design is submitted to their office by their hired consultant. Bonoan said that he expects that retrofitting design would be submitted to his office this week. (PHOTO PIA)

2nd bridge will also be constructed

RETRO WORKS. DPWH Sec. Manuel Bonoan disclosed that the repair works at the San Juanico Bridge would commence once the retrofitting design is submitted to their office by their hired consultant. Bonoan said that he expects that retrofitting design would be submitted to his office this week.    (PHOTO PIA)

TACLOBAN CITY – Rehabilitation of the iconic San Juanico Bridge will begin once its retrofitting design is submitted by June 5, according to Department of Public Works and Highways (DPWH) Secretary Manuel Bonoan.

During his May 30 visit to Tacloban City, Bonoan said only remedial repairs will be implemented initially to increase the bridge’s load capacity to 12 tons, pending the construction of a proposed second bridge.

“We are giving the consultant until June 5 to submit the retrofitting design, which will be used as the basis to begin the bridge’s repair works,” Bonoan said, adding that he instructed the consultant to expedite the process.

“Our goal is to increase the bridge’s load capacity to 12 tons. This would help ease traffic congestion caused by the current load limit,” he added.

“I have instructions from the President to act on the traffic issues brought about by these restrictions.”

Currently, trucks over 3 tons are prohibited from crossing the 2.16-kilometer bridge linking Leyte and Samar due to safety concerns.

To ease the disruption, DPWH has designated the Amandayehan Port in Basey, Samar as a temporary loading point for rerouting heavy vehicles via roll-on/roll-off transport to Tacloban City.

The P2.1-billion retrofitting will cover all 42 bridge spans, while a full rehabilitation, projected at P5.68 billion, will follow once the new bridge is underway. That upgrade is expected to boost the load limit to 33 tons.

About 1,400 heavy trucks use the bridge daily.

Bonoan also revealed plans for a second San Juanico Bridge, a 2.6-kilometer structure to be funded by the Japanese government.

It will connect Babatngon, Leyte to Sta. Rita, Samar via the Janbatas Channel. Detailed engineering will be completed in 2026, with construction slated for 2027.

To manage traffic and port congestion, the provincial governments of Leyte and Samar are also identifying alternative ports, including Catbalogan City and the towns of Babatngon, Carigara, and Palompon.

These sites are under review by the Philippine Ports Authority.

(ROEL T. AMAZONA, JOEY A. GABIETA)

Over 2 million EV workers to receive wage hike starting June 1

0

TACLOBAN CITY – More than 2 million workers in the region will start receiving the second tranche of their minimum wage increase beginning Sunday, June 1.

Under Wage Order No. 24, issued by the Regional Tripartite Wages and Productivity Board (RTWPB) and approved on November 5, 2024, the daily minimum wage will rise to P435 for non-agriculture workers and P405 for those in the agriculture sector.

Previously, the minimum wage stood at P420 and P390 for the non-agriculture and agriculture sectors, respectively.

A labor inspection officer from the Department of Labor and Employment (DOLE) in the region said that inspections and advisory visits are ongoing to ensure compliance.

“Violators will be required to pay the wage differential,” the officer said, adding that penalties may include fines of up to P200,000, imprisonment of up to four years, or closure of the establishment.

Although exact figures on violators are not yet available, previous reports show that wage violations in the region remain minimal.

Wage Order No. 24 provides exemptions for distressed establishments, retail or service firms with 10 or fewer employees, and new businesses within a two-year grace period.

(JOEY A. GABIETA)

Early morning fire guts business establishments in downtown Ormoc; firefighter Injured

0
BIG FIRE. Several business establishments were gutted in a massive fire in Ormoc City’s business center on Sunday early morning. (ENGR. CAPT. ERIC M. CODILLA, JR.)
BIG FIRE. Several business establishments were gutted in a massive fire in Ormoc City’s business center on Sunday early morning.   (ENGR. CAPT. ERIC M. CODILLA, JR.)

ORMOC CITY – A massive fire swept through several commercial establishments in the heart of Ormoc City in the early hours of Sunday, June 2, 2025, damaging multiple businesses and injuring a firefighter, authorities confirmed.

According to a report from the Ormoc City Police Station 1 (OCPS1), the blaze erupted around 12:40 am at the intersection of Mabini, Burgos, Real, and Aviles Streets in Barangay South.

Responding to a call from the City Tactical Operations Center, OCPS1 personnel immediately rushed to the scene. Upon arrival, firefighters from the Bureau of Fire Protection (BFP) Ormoc City were already engaged in battling the flames.

Initial investigation suggests that the fire originated at two food establishments—Nicey Burger and Bord’s Karenderya—although the identity of the owner has yet to be confirmed.
The fire quickly spread to adjacent businesses, including TGP Pharmacy, St. Jude Agricultural Supplies, Chooks to Go, Uling Roaster, Ormoc Mercury Hardware, Van’s Clothing Shop, and other nearby stalls.

The BFP declared the fire under control at 2:23 am, and it was fully extinguished by 3:44 am.

No civilian casualties were reported, but one BFP personnel sustained injuries during the firefighting operations.

The cause of the fire and the estimated cost of damage are still under investigation.

(ELVIE ROMAN ROA,ROBERT DEJON)

Suspected Mpox case under monitoring in Maasin City

0

TACLOBAN CITY – A 55-year-old woman from Maasin City is under isolation for a suspected case of Mpox (monkeypox), Mayor Nacional Mercado confirmed on Friday, May 30.

Local health authorities are conducting contact tracing while waiting for confirmatory test results.

The Department of Health (DOH) in the region expects to receive the patient’s specimen by Monday, June 2, before forwarding it to the Research Institute for Tropical Medicine (RITM) in Mandaluyong City.

Mayor Mercado has ordered the reimplementation of health protocols, including mandatory face mask use and physical distancing, to prevent possible transmission.

Boyd Cerro, head of the DOH Regional Epidemiology and Surveillance Unit, said this is the region’s ninth suspected Mpox case, with all previous cases from Leyte, Biliran, and Samar testing negative.

A private hospital in Ormoc City also denied reports of treating a confirmed Mpox patient.
Mpox is a viral illness with symptoms like fever, swollen lymph nodes, and a distinct rash. It spreads through close contact with infected individuals or contaminated materials.

(RONALD O. REYES)

Dangerous decline

0

The highway connecting Tanauan to Burauen is fast deteriorating into a dangerous stretch of broken asphalt and deep fissures. The situation is unacceptable, and the Department of Public Works and Highways must be held to account for this glaring neglect.

What used to be a vital road for commuters and cargo transport has now turned into a nightmare of craters and uneven surfaces. Some cracks are so wide and deep that even experienced drivers slow to a crawl or swerve abruptly to avoid them. However, these evasive maneuvers have become just as deadly—they could result in side swipes, near collisions, and even vehicles veering off the road, showing that the danger now lies not only in the damage itself but in the human response it provokes.

The mandate of the DPWH is clear: to ensure roads are safe, functional, and well-maintained. The Tanauan-Burauen route is not some obscure back road; it is a provincial artery that connects communities, sustains local economies, and links people to basic services. Allowing it to decay to this extent signals more than mere inefficiency—it betrays a lack of urgency and concern for public safety. When a government agency fails in its fundamental duties, the consequences are not just logistical—they are life-threatening.

Motorists now face a cruel dilemma: brave the route and risk their vehicles or their lives, or take costly detours that sap time, fuel, and energy. Public transportation operators suffer delays and incur repair expenses, farmers and market vendors endure prolonged travel, and emergency vehicles are slowed in moments where every second counts. This is not just an inconvenience—it is a disruption of public life, a hazard to welfare, and an indictment of governance.

The solution must begin with visibility and accountability. The DPWH must inspect, evaluate, and act immediately, not in months, but in days. Clear signage, temporary fixes, and proper coordination with local government units can minimize further damage and accidents. More importantly, rehabilitation plans must be transparent, budgeted, and enforced. The people of Leyte deserve roads they can travel on safely and with dignity.

Recent Posts

DALMACIO C. GRAFIL
PUBLISHER

ALMA GRAFIL
EDITOR-IN-CHIEF

ROMEO CEBREROS
OFFICE IN-CHARGE

OFFICE
BRGY. SONGCO, BORONGAN CITY

CONTACT NUMBERS
(055) 261 – 3319 | 0955 251 1533 | 0917 771 0320 | 0915 897 7439 | 0921 511 0010

DALMACIO C. GRAFIL
PUBLISHER

RICKY J. BAUTISTA
EDITOR

ALMA GRAFIL
BUS. MANAGER

OFFICE
RIZAL AVENUE, CATBALOGAN
(INFRONT OF FIRE DEPARTMENT, NEAR CITY HALL)

CONTACT NUMBERS
0917 771 0320 | 0915 897 7439 | 0921 511 0010

EMAIL
lsdaily2@yahoo.com

WEBSITE
www.issuu.com/samarweeklyexpress