NSSDEO, Brgy, Burabud, Laoang, Northern Samar – The Department of Public Works and Highways Northern Samar Second District Engineering Office (DPWH NSSDEO)-Maintenance Section led by Acting Chief, Nicanor L. Mejos, Jr., conducted an on – site inspection and structural assessment on December 8, 2025, along the affected section of the Mapanas – Siljagon Road, particularly at Sitio Cabungaan, Brgy. Sta. Potenciana, Mapanas, Northern Samar, following reports of a damaged and scoured road foundation. The deterioration was caused by the severe scouring and erosion of the road subbase and base materials due to the strong floodwater flow brought by Typhoon “Wilma”.

Upon receipt of the report, DPWH maintenance personnel were promptly dispatched to assess the extent of the damage, ensure safety of road users, and implement immediate mitigation measures to prevent further deterioration of the affected road section.

During the inspection, the team noted the presence of a hanging or unsupported PCCP slab caused by an undermined foundation. To address this, they immediately installed steel sheet piles along the roadway as a temporary support to serve as a running board, ensuring the safe passage of vehicles while long–term repair plans are being prepared.

The DPWH assures the public that it will continue to closely monitor the condition of the area and implement the necessary interventions to safeguard motorists and restore the integrity of the affected road section. The Department remains steadfast in its commitment in ensuring safe, reliable, and resilient infrastructure for the communities it serves.

(Jinky A. Dela Cruz/PR)